Reliable Lead-Acid & Lithium Batteries for Your Market
Our Products
Two Battery Lines, Every Application Covered
Choose the chemistry that fits your market — cost-effective VRLA lead-acid, or long-cycle lithium for the energy transition era.
VRLA · AGM · GEL · Deep Cycle
Nine series from general-purpose standby to 20-year long-life and extreme-climate GEL. Proven technology, stable supply, container-optimized packaging.
LiFePO4 · NMC · Custom Packs
Three lines covering drop-in LiFePO4 replacements with 3000+ cycles, high-density NMC packs, and fully custom battery packs with smart BMS.
Best Sellers
Hot Products for Wholesalers
The series our distributors reorder most — proven in 80+ markets.
Applications
Powering Every Scenario
UPS & Data Center
Backup power for mission-critical systems
Solar & Wind Storage
Renewable energy storage systems
Telecom & Base Station
48V systems, front-terminal & long-life batteries
Golf Cart & Light EV
Deep cycle power for electric vehicles
Security & Emergency
Alarm, emergency lighting, fire systems
RV & Marine
LiFePO4 drop-in replacement for leisure
Medical Equipment
Reliable backup for healthcare devices
Auto & Motorcycle SLI
Starting, lighting, ignition batteries
Inside the Assembly Plant
We Buy the Plates. The Rest Is Ours.
Plates and cells come from audited suppliers and are inspected on arrival. Matching, cast-on-strap welding, sealing and testing all happen in our own shop in Shenzhen — that is the part we control, and the part that decides whether a battery reaches year three.
- 01
Batch by batch
Incoming inspection
Plate weight, thickness and paste moisture are checked batch by batch. A failed batch goes back to the supplier — it does not go on the line.
- 02
Sorted before assembly
Capacity matching
Plates and cells are sorted into capacity bands before they meet each other. A pack is only as strong as its weakest cell.
- 03
COS welding
Cast-on-strap welding
The plate group is cast-welded into a single strap and dropped into the case. Internal resistance is decided here, not on the datasheet.
- 04
100% leak tested
Sealing
Case and cover are heat-sealed, then every single unit gets a pressure leak test — not a sample.
- 05
Every unit
Electrical test
Open-circuit voltage and internal resistance on every unit; capacity is verified by batch sampling.
- 06
1.2 m drop test
Packing
Export cartons are drop-tested on our own floor before they are allowed onto a pallet.
Click to enlarge
News & Insights
Industry Updates

That 1,200-Cycle Claim Has a Test Method Behind It. Ask What It Is.

Tubular or Flat Plate: Stop Paying for Cycles You Will Never Use

Six Things to Check Before You Wire a Deposit to a Battery Factory
OEM / ODM Service
Build Your Own Battery Brand
Your logo, your packaging, your specification. From cell selection to BMS logic and label design — engineering feedback within 48 hours, samples in 1–2 weeks.
Start an OEM ProjectReady to Grow Your Battery Business?
Send us your requirements — model, quantity and target market. Quote within 24 hours.
Send Your Inquiry



